Island City Centre (ICC)

Client : TBC

As part of our holistic fire strategy input for the ICC, we developed an optimised and robust structural fire engineering strategy for two high-rise residential towers of 53 and 60 storeys. Through consideration of the range of fires that may develop, alongside an appreciation of the project specific failure consequences, our strategy assured that the structural fire resistance expectations were efficient, but also had longevity by considering what changes might happen during the buildings’ life-span.

ICC.jpg